- 137
- Japan
It is the part that was heard in the video of Twitch. It might not transmitted well by the translation.
Car: There is no change.
Track: Reduced 4 Location?
Campaign Mode: Total 117 to 115 (reduced from mission event is 62 to 60)
Other interesting comments:
''VGT is about half remaining. Each manufacturer has us prepared for GTS.''
''The GTS of the monthly calendar can be planning an event using each manufacturer.''
''PSVR is functioning in the studio. Want to play in the Release Date.''
''Scheduled to be completed after 56 days.''
Car: There is no change.
Track: Reduced 4 Location?
Campaign Mode: Total 117 to 115 (reduced from mission event is 62 to 60)
Other interesting comments:
''VGT is about half remaining. Each manufacturer has us prepared for GTS.''
''The GTS of the monthly calendar can be planning an event using each manufacturer.''
''PSVR is functioning in the studio. Want to play in the Release Date.''
''Scheduled to be completed after 56 days.''